Anderson Road - Design and Construction Services

Civil

Client: City of Houston Houston, Texas

Preliminary Engineering and Final Design for toll road on/off ramps, reconstruction to five-lane concrete section and new four-lane bridge over Spring Creek.

Description: Preliminary Engineering and Final Design for toll road on/off ramps, reconstruction to five-lane concrete section and new four-lane bridge over Spring Creek.

  • Preliminary and final design
  • 1.1 mile reconstruction of existing 2-lane asphalt surface to 4-lane concrete roadway
  • Typical section 44-foot wide, 10-inch concrete with curb and gutter
  • Replacement of existing 8-inch water line
  • New underground storm sewer system with discharge into Harris County Flood Control District regional detention facility
  • Bridge deck widening and replacement
  • Traffic signal upgrade
  • Coordination of Subconsultants
  • Project Cost: $3.2 Million