Anderson Road - Design and Construction Services

Client: City of Houston Houston, Texas
Preliminary Engineering and Final Design for toll road on/off ramps, reconstruction to five-lane concrete section and new four-lane bridge over Spring Creek.
Description: Preliminary Engineering and Final Design for toll road on/off ramps, reconstruction to five-lane concrete section and new four-lane bridge over Spring Creek.
- Preliminary and final design
- 1.1 mile reconstruction of existing 2-lane asphalt surface to 4-lane concrete roadway
- Typical section 44-foot wide, 10-inch concrete with curb and gutter
- Replacement of existing 8-inch water line
- New underground storm sewer system with discharge into Harris County Flood Control District regional detention facility
- Bridge deck widening and replacement
- Traffic signal upgrade
- Coordination of Subconsultants
- Project Cost: $3.2 Million