Bayport Rail Storage Facility

Client: Bayport Rail Terminal Services Houston, Texas
Coordinated drainage analysis for 343-acre tract, including approval by HCFCD.
Description:
- Coordinated drainage analysis for 343-acre tract, including approval by HCFCD.
- Preliminary and final design of detention facility for 343-acre tract.
- HEC1 study for drainage requirement in an extreme event.
- Prepared construction drawings for over 28,000 linear feet of rail for both main leads and storage tracks.
- Provided construction drawings for design of storm drainage facilities.
- Prepared Storm Water Pollution Prevention Plan.
Project Cost: $4.5 Million
View Other Airport, Rail & Port Projects Listings